• Electrical Change Order Costs with Rsmeans Data

Electrical Change Order Costs with Rsmeans Data

In stock (1 available)
SKU SHUB230628
$241.99 $229.19
Free Shipping within the US
Get it by: Sep 23, 2026

Product Details

ISBN-13: 9781943215539
ISBN-10: 1943215537
Publisher: Gordian RSMeans Data
Publication date: 2016-12-20
Edition description: Annual
Pages: 610
Product dimensions: Height: 10.75 Inches, Length: 8 Inches, Weight: 2.7 pounds, Width: 0.75 Inches
Author: Rsmeans
Language: en
Binding: Paperback

Customer Reviews